Factory Outlets Chlorine Gas Dosing System - HPL2 Series Two Tank Continuous Polymer Preparation System – Haibar
Factory Outlets Chlorine Gas Dosing System - HPL2 Series Two Tank Continuous Polymer Preparation System – Haibar Detail:
The HPL2 series continuous polymer preparation system is a kind of macromolecule automatic dissolver. It is composed of two tanks which are respectively used for liquid mixing and maturing. The separation of two tanks by a partition panel allows the mixture to enter the second tank successfully.
|
Type |
Design |
Amount of medicine solution (Lt/hr) |
Tank size (L) |
Powder conveyor |
Powder agitator (HP) |
Material |
Dimension |
Weight |
|||||
|
Standard |
Special |
Length |
Width |
Height |
L1 |
W1 |
|||||||
|
HPL2-500 |
2 tank |
500 |
55 |
1/4 |
1/2*2 |
SUS304 |
SUS316 PP PVC FRP |
1750 |
850 |
1700 |
1290 |
640 |
240 |
|
HPL2-1000 |
1000 |
55 |
1/4 |
3/4*2 |
2050 |
50 |
2000 |
1480 |
740 |
370 |
|||
|
HPL2-1500 |
1500 |
55 |
1/4 |
1*2 |
2300 |
1100 |
2000 |
1650 |
900 |
450 |
|||
|
HPL2-2000 |
2000 |
110 |
1/4 |
1*2 |
2650 |
1250 |
2250 |
2010 |
1030 |
510 |
|||
Product detail pictures:
Related Product Guide:
So that you can finest fulfill client's demands, all of our operations are strictly performed in line with our motto "High Excellent, Competitive Price, Fast Service" for Factory Outlets Chlorine Gas Dosing System - HPL2 Series Two Tank Continuous Polymer Preparation System – Haibar , The product will supply to all over the world, such as: Finland, New York, New Zealand, Most problems between suppliers and clients are due to poor communication. Culturally, suppliers can be reluctant to question things they do not understand. We break down those barriers to ensure you get what you want to the level you expect, when you want it. Faster delivery time and the product you want is our Criterion .
This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
Inquiry
Write your message here and send it to us



