Short Lead Time for Sludge Dewatering Unit - Screw Press sludge dewatering machine – Haibar

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Bear "Customer first, High quality first" in mind, we perform closely with our consumers and provide them with efficient and experienced services for Coagulant Dosing System , Volute Screw Press , Centrifuge Separator , Striving hard to attain continual success determined by high quality, reliability, integrity, and complete understanding of current market dynamics.
Short Lead Time for Sludge Dewatering Unit - Screw Press sludge dewatering machine – Haibar Detail:

Mechanical Principle

The initial section of dewatering drum is Thickening Zone where the solids-liquid separating process takes place and where the filtrate will be discharged. The pitch of the screw and the gaps between the rings decrease at the end of dewatering drum, increasing the internal pressure of the drum. At the end, End Plate further increases the pressure so as to discharge dry sludge cake.

Process Diagram of the Vloute Dewatering Press

Sludge, first fed into the Flow Control Tank, flows into the Flocculation Tank where polymer coagulant is added. From there, the flocculated sludge overflows into the dewatering drumwhere it is filtered and compressed. The entire operation sequence, including sludge feedcontrol, polymer makeup, dosing and sludge cake discharging, is controlled by the built-in-timer and sensors of the Control Panel.

Screw Press sludge dewatering machine3


Product detail pictures:

Short Lead Time for Sludge Dewatering Unit - Screw Press sludge dewatering machine – Haibar detail pictures

Short Lead Time for Sludge Dewatering Unit - Screw Press sludge dewatering machine – Haibar detail pictures

Short Lead Time for Sludge Dewatering Unit - Screw Press sludge dewatering machine – Haibar detail pictures


Related Product Guide:

Our company promises all users of the first-class products and the most satisfying post-sale service. We warmly welcome our regular and new customers to join us for Short Lead Time for Sludge Dewatering Unit - Screw Press sludge dewatering machine – Haibar , The product will supply to all over the world, such as: Bhutan, Bulgaria, Pakistan, Certainly, competitive price, suitable package and timely delivery will be assured as per customers' demands. We sincerely hope to build business relationship with you on the basis of mutual benefit and profit in the very near future. Warmly welcome to contact us and become our direct cooperators.
  • We are really happy to find such a manufacturer that ensuring product quality at the same time the price is very cheap.
    5 Stars By Isabel from Colombia - 2018.09.12 17:18
    The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
    5 Stars By Hedda from Philippines - 2017.09.28 18:29

    Inquiry

    Write your message here and send it to us

    Inquiry

    Write your message here and send it to us